contemporary

 Worker’s house

Province of

antwerp

about this project

We built an additional floor on top of this building and isolated and plastered the façade, using the most innovative techniques with a lot of attention to detail. This way an old worker’s house instantly gained a lot of cachet and value.

 

Services

• placing the structure

   for a beam and pot

   floor

• plastering

• roofing

• isolation of facades

   and crepi

• improving stability

 

timing

3 months

© 2020 I Renova eu B.V. I ceresstraat 1/116 - 4811 CA Breda, + 32 (0)471 02 02 64 I +31(0)6 25 00 96 61 I BTW BE 0549.821.437, BTW NL 853619621B01

NL

E

Services

• placing the structure

  for a beam and pot

  floor

• plastering

• roofing

• isolation of facades

  and crepi

• improving stability

timing

3 months

© 2020 I Renova eu B.V. I ceresstraat 1/116 - 4811 CA Breda, + 32 (0)471 02 02 64 I +31(0)6 25 00 96 61 I BTW BE 0549.821.437,

BTW NL 853619621B01

contemporary

 Worker’s house

Province of

antwerp

about this project

We built an additional floor on top of this building and isolated and plastered the façade, using the most innovative techniques with a lot of attention to detail. This way an old worker’s house instantly gained a lot of cachet and value.

 

Services

• placing the structure

  for a beam and pot

  floor

• plastering

• roofing

• isolation of facades

  and crepi

• improving stability

timing

3 months

E

© 2020 I Renova eu B.V. I

ceresstraat 1/116, 4811 CA Breda,

+ 32 (0)471 02 02 64 I +31(0)6 25 00 96 61 I

BTW BE 0549.821.437, BTW NL 853619621B01